July 2007 Final Engineering Evaluation & Cost Analysis

July 2007 FINAL Engineering Evaluation/Cost Analysis (EE/CA) for the Mike Horse Dam and Impoundment Tailings, Lower Mike Horse Creek, Beartrap Creek, and the Upper Blackfoot River Floodplain Removal Area, Upper Blackfoot Mining Complex

All documents are in pdf format. Some documents may be large and take extra time to download.

Documents

Appendices

Figures