Beaver Salvage
Salvage wind-felled trees and reduce associated debris created by June 2018 storm. Salvage is proposed to clear trees from campgrounds and fences, reduce fuel hazards created by downed materials, and salvage timber volume for economic value.
Project Summary
Location Summary:
Upper Bonaparte Cr at Township 38 N., R. 30 E., S 9-10; Beaver Cr at T. 39 N., R. 30 E., S 25; Lower Toroda Cr at T. 39 N., R. 2, S 4-5 and at T.40 N., R.31 E., S32
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/22/2018 |
Decision | 09/2018 (Estimated) |
Implementation | 10/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (13), 36 Cfr 220.6(E)(13)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tonasket Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Forest Products
Project Activity:
Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
Current Status:
Completed
Project Decision Information
Beaver Salvage
Decision Signed Date: 09/26/2018
Forests:
Okanogan-Wenatchee National Forest
Districts:
Tonasket Ranger District
States:
Washington
Counties:
Okanogan
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Paul Nash
1 West Winesap
Tonasket, WA 98855
509-486-5153
pwnash@fs.fed.us
Last Updated: 9/26/2018