Construction of a 450-foot long by 5-foot wide drainage ditch using a track hoe, to mitigate the Munger Mountain landslide that is affecting South Highway 89. Some residual water will still seep into the wetland, per ACOE direction. Remnants from a spring development (SUP issued to previous owners and closed when property was sold to WYDOT) including panel fence, spring box and pipes, will be removed from FS lands. Project area would be covered for pre/post weed treatment by Teton County Weed and Pest.