Skip to main content

BPA Building Replacement Tunk Mountain

The Bonneville Power Administration (BPA) proposes to replace existing the existing building and propane tank at Tunk Mountain with a 24' x 16' structure with an entry vestible.

Project Summary

Last Updated: 6/19/2012