Skip to main content

1900 Flood Repair

Restore Forest Service Road 1900 at mile post 5.1and mile post 2.0 to the full two-lane capacity. The road shoulder and fill slope will be rebuilt with wood or dissipation structures.

Project Summary

Last Updated: 5/8/2012