Sierra Pacific Power Company (NV Energy) Powerline Rebuild Project - Line 133
The Sierra pacific Power Company (NV Energy) proposes replacing three transmission lines (101, 102, 133) to modernize the electric design line along the existing alignment (right of way) and improve reliability within the electric power grid.
Project Summary
Location Summary:
The project runs northeast from the west side of Donner Lake to Verdi, California following the existing 133 powerline rights of way.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/01/2024 |
| Decision | 04/2026 (Estimated) |
| Implementation | 04/2026 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Truckee Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
In Progress
Forests:
Tahoe National Forest
Districts:
Truckee Ranger District
States:
California
Counties:
Nevada; Sierra
Legal Land Description:
Beginning at t17N, R15E, S17 running northeast to T19N, R18E, S7.
We're sorry, the documents for this project are not currently available. Please try again later.
Gabriela Yanez
10811 Stockrest Springs Road
Truckee, CA 96161
7753098096
gabriela.yanez@usda.gov
Last Updated: 3/27/2026