Skip to main content

Pearl River Valley EPA Powerline Upgrade and Relocation along Hwy. 15

Relocate an overhead powerline to a new location along a state highway, upgrade the line from 7,200 to 14,400 volts, and remove abandoned poles and wire.

Project Summary

Last Updated: 3/25/2020