Skip to main content

Donley Cabin Bridge and Pit Toilet Relocation Project

Reconstruct and relocate the North River trail bridge with single log bridge, recontour soil around cabin to divert water away from the cabin, and relocate and potentially reconstruct the existing pit toilet and dig a new toilet pit.

Project Summary

Last Updated: 5/18/2021