Skip to main content

Tormey Exploration Drilling

Ethos Geological Inc. proposes drilling several holes averaging 150m depth (max 350m/1000ft) from 10 drill sites. These exploration holes will be drilled within one year of the proposed start date or an extension will be applied for if the Operators

Project Summary

Last Updated: 9/27/2022