Berkeley Timing Cable
The Discovery Ski Team proposes to bury 3000 feet of cable for electronic timing equipment for nationally sanctioned ski races. The computer network cable would be encased in 1 inch conduit bured 6 inches underground by a ditchwitch.
Project Summary
Location Summary:
Discovery Ski Area in the Clarkfork Flint Landscape, Georgetown Lake Management Area
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 12/13/2011 |
| Comment Period | 05/07/2012 |
| Decision | 06/2012 (Estimated) |
| Implementation | 07/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pintler Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Area Management
Project Activity:
Developed Site Management
Current Status:
Completed
Project Decision Information
Berkeley Timing Cable
Decision Signed Date: 06/08/2012
Forests:
Beaverhead-Deerlodge National Forest
Districts:
Pintler Ranger District
States:
Montana
Counties:
Granite
Legal Land Description:
T6N R13W, Sections 20 and 21
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Blake
88 Business Loop
Philipsburg, MT 59858
406-859-3211
jbblake@fs.fed.us
Last Updated: 6/26/2013