Skip to main content

Seeded Pasture Pipeline Extention

The proposed action is to bury approximately 1600 feet of 1 ½ inch plastic pipe, from the existing water tank in Section 6 to a new water tank located on BLM ground in Section 7. Approximately 1200 feet of the pipeline is located on National Forest.

Project Summary

Last Updated: 6/7/2013