State: Alaska | | | | | | | | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
ALASKA | | | |
Total planned offered within IRAs MMBF | 113.00 | 113.00 | 92.00 | 96.00 | 125.00 | 539.00 | | | | 515.00 | 24.00 | | Helicopter | 0.00 | 27.00 | 27.00 |
Of the above, how much requires road (re)construction (MMBF)? | 108.00 | 107.00 | 87.00 | 91.00 | 119.00 | | 512.00 | | | 488.00 | 24.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 45.00 | 45.00 | 36.00 | 38.00 | 50.00 | | | 214.00 | | 204.00 | 10.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 27.00 | 27.00 |
How many miles of temporary road construction will be required? | 16.00 | 16.00 | 13.00 | 14.00 | 18.00 | | | 77.00 | | 74.00 | 3.00 | | |
TONGASS | | | |
Total planned offered within IRAs MMBF | 113.00 | 113.00 | 92.00 | 96.00 | 125.00 | 539.00 | | | | 515.00 | 24.00 | | Helicopter | 0.00 | 27.00 | 27.00 |
Of the above, how much requires road (re)construction (MMBF)? | 108.00 | 107.00 | 87.00 | 91.00 | 119.00 | | 512.00 | | | 488.00 | 24.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 45.00 | 45.00 | 36.00 | 38.00 | 50.00 | | | 214.00 | | 204.00 | 10.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 27.00 | 27.00 |
How many miles of temporary road construction will be required? | 16.00 | 16.00 | 13.00 | 14.00 | 18.00 | | | 77.00 | | 74.00 | 3.00 | | |
| | |
| | | | | | | | | | | | | | | | |